Customise Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

On this page
Imperial College, Glenister Lecture Theatre
London
Snapshot
Value

£750,000

AREA

200m²

CLIENT

Imperial College London

CONTRACTOR

Russel Cawberry

STRUCTURAL ENGINEER

Curtins

ARCHITECT

Burwell Architects

SERVICES PROVIDED
  • Engineering services design
OFFICE

London

COMPLETION

2020

About Imperial College London, Glenister Lecture Theatre

We have been working with Imperial College London since 2006 and have successfully delivered more than 60 projects including Glenister Lecture Theatre, located at their Charing Cross Campus. This project was tasked with upgrading older lecture spaces to promote contemporary teaching methods and provide additional flexible study spaces.

Located in Hammersmith the lecture theatre was originally completed in the 1960s and has had little refurbishment since.

Prior to this project, our team has already successfully delivered two similar lecture theatres at the South Kensington campus. The main goal was to repurpose the traditional tiered seating rows into group desking to promote alternative teaching methods and to also provide flexibility for students to use them outside of teaching hours for informal group study. These were so well received, a further six lecture theatres have been identified for similar refurbishments.

We were engaged to provide the MEP services design in a challenging programme for summer construction ready for the start of teaching in September. All new ventilation and cooling was provided using invertor driven fans with CO² sensing to optimise the ventilation according to occupancy allowing the space to be used by small groups of students outside of teaching hours with the plant running at reduced output to optimise energy use.

LED lighting was provided with a programmable lighting control scene setting system integrated with the state-of-the-art AV system. Lighting scenes were provided to enable the space to be used in a variety of functions with lighting control directly from the lecturers iPad (to allow the lecturer to be mobile when presenting).

Contemporary acoustic ceilings using natural materials were provided with the services distribution blacked out to integrate it visually above the wooden slatted panels. Services were positioned in the accessible areas of the ceiling for ease of maintenance. Power was provided to each seat in the form of USB A, USB C and 3 pin 13A outlets to provide flexibility of device connectivity.

AV provisions included flexibility to use large LED screens or projection for presentations with sight lines considered for students in all seating positions.

The project was successfully delivered during the COVID-19 pandemic (September 2020) with all the additional challenges that situation presented.

image
On this page